Preliminary Estimating Method

  • Preliminary estimate methods consist of three method which are:
    1. Valuation Method
    2. Floor Area Method (go calculator)
    3. Cubic Content Method (go to calculator)
  • It is used to get the cost of the project which is including the calculation based on drawing and specification.
  • In this site however only provided two of them.
  • Click the link to go to the calculator page

Built Up-Rate Method

  • Built up-rate method include requirement and uses of the price rates and schedule of rates.
  • Next, this method explain basic criteria of price rate calculation; materials, labour, plants, overheads and profits.
  • Price rate construction is calculate by using build up-rate method