2.0. BUILD-UP RATE ( bina kadar harga )

2.0.1. Basic Of Built-Up Rate Calculation Need.

  1. Material cost
  2. Labour cost
  3. Machinary and tool / equipment cost
  4. Overhead cost
  5. Profit cost 

2.0.2. Uses And Requirement

  • Build-up rate
    • to know breakdown of the cost
    • to price up cost
    • get budget
    • to know overhead
    • to know the construction of the building
  • schedule of rate
    • construction
    • civil engineering ex road
  • bases of price rate

a) Material Cost

  1. basic price of materials 
  2. delivery cost of material ( transportation)
  3. storage cost ( store )
  4. wastage cost ( percentage )

   i.e :        cement 5 %

 tiles  2% 

Timber 5%

                   Steel 10%

b) Labour Cost

  1. Skill labour
  2. Medium skill labour
  3. General labour

c) Machinery And Tool / Equipment

MANUAL

  1. Ladder
  2. Shovels
  3. Scope
  4. Wheel barrow
  5. Scafholding
  6. Tool case
  7. Bucket

MACHINE

  1. Money allocated
  2. Decrease price
  3. Loss of investment cost
  4. Interest cost
  5. Maintenance cost
  6. Transportation from one site to other site
  7. Operator cost

d) OVERHEAD COST

  • Tools cost
  • Labour
  • Salary 
  • Rent of office
  • Bank
  • Electrical
  • Water bill

e)         Profit ( % )